INVITATION TO QUOTE – PLANT & EQUIPMENT SUPPLY

Drainforce Site • August 12, 2026

D/F UK Ltd

D/F UK Ltd is inviting competitive quotations from suitably qualified and experienced suppliers for the supply of new plant and equipment as detailed below.


Suppliers are welcome to submit quotations for one, multiple, or all of the items listed.


ITEM 1 – 5 TONNE ELECTRIC FORKLIFT TRUCK


We require a new electric forklift truck suitable for industrial use.


Minimum requirements:

  • Approximately 5,000kg (5 tonne) lifting capacity
  • Electric powered
  • Approximately 6 metre maximum lift height
  • Suitable mast configuration for the required lift height
  • Appropriate industrial battery and charging equipment
  • Suitable forks for general industrial use
  • Operator safety equipment and warning systems
  • UK compliant and supplied with all appropriate certification
  • Manufacturer's warranty
  • Delivery to our premises
  • Supplier to state expected lead time
  • Operator familiarisation/training to be quoted where available

Suppliers should provide full technical specifications with their quotation.


ITEM 2 – OFF-ROAD HOSE REEL, TRAILER & HOSE


We require a heavy-duty mobile hose reel system suitable for off-road and industrial use.

Requirements:

  • Heavy-duty hose reel
  • Mounted on a suitable off-road/towable trailer
  • Heavy-duty industrial hose
  • Suitable for use across uneven/off-road ground
  • Robust construction suitable for regular commercial use
  • Appropriate connections/fittings
  • Supplier to specify hose length, diameter and working pressure available
  • UK compliant and supplied with appropriate certification where applicable
  • Manufacturer's warranty
  • Delivery included or separately identified
  • Supplier to state expected lead time

Suppliers should provide details of the proposed system and full technical specifications.


ITEM 3 – 180–230 CFM TOWABLE COMPRESSOR & GENERATOR


We require a towable air compressor with integrated or associated generator capability for industrial/site use.

Requirements:

  • Air output within approximately 180–230 CFM
  • Towable/mobile configuration
  • Suitable for industrial and site use
  • Generator/electrical power capability
  • Road-towable configuration where applicable
  • Appropriate safety systems
  • UK compliant and supplied with all relevant certification
  • Manufacturer's warranty
  • Delivery included or separately identified
  • Supplier to state expected lead time

Suppliers should clearly state the compressor's CFM output, operating pressure, generator output and full technical specification.


QUOTATION REQUIREMENTS


For each item quoted, suppliers should provide:

  • Manufacturer and model
  • Full technical specification
  • Price excluding VAT
  • VAT
  • Total price including VAT
  • Delivery costs, if applicable
  • Installation/commissioning costs, if applicable
  • Expected delivery lead time
  • Warranty details
  • Payment terms
  • Details of servicing and after-sales support
  • Confirmation of quotation validity



Alternative equipment meeting or exceeding the above requirements may be proposed, provided any differences are clearly identified.


ASSESSMENT


Quotations will be assessed on overall value for money, suitability for our operational requirements, specification, quality, delivery timescale, warranty and after-sales support.


The lowest-priced quotation will not necessarily be selected if another proposal provides better overall value and suitability.


SUBMISSION OF QUOTATIONS


Closing date for quotations: Friday 21 August 2026

All quotations and supporting information should be emailed to:

info@drainforce.co.uk

Please use the email subject:

Plant & Equipment Quotation – D/F UK Ltd


Suppliers may quote for individual items or any combination of the three items.

This requirement is being publicly advertised to provide an open opportunity for suitably qualified suppliers to submit competitive quotations and to demonstrate best value in the procurement process.


D/F UK Ltd reserves the right not to proceed with any or all of the purchases detailed within this invitation.

By Drainforce Site August 5, 2026
Congratulations to Luke Mellin on His Promotion to Director
By Drainforce Site June 4, 2026
Leading provider of specialist wastewater rehabilitation services
By Drainforce Site June 2, 2026
We are Delighted to Announce the Promotion of Jamie Hooper to Director at Drainforce 
By Drainforce Site June 1, 2026
A New Addition to the Specialist Fleet 
By Drainforce Site February 17, 2026
Reinforcing Our Safety Culture Across All Regions 
By Drainforce Site September 7, 2025
Drainforce has successfully completed its Target Catchment Investigation Trial and expanded on its success with Thames Water through proactive investigations.
By Drainforce Site September 7, 2025
Proven performance secures new £5m framework over 8 years for South Wales and the Southwest  28th August 2025
By Drainforce Site March 4, 2025
Drainforce is now underway with its Targeted Catchment Investigation Trial
By Drainforce Site February 6, 2025
Drainforce Limited Awarded Targeted Catchment Investigation Contract Across Thames Water Region
By Drainforce Site February 5, 2025
We are thrilled to announce that Drainforce has been awarded the Swansea Council Gully Sucking Contract!